抹面砂漿在施工后需要馬上保養,保養需要留意施工時的溫度,在依據溫度的狀況確認保養時需要準備的材料,此外也是有無需保養的產品,具體保養條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.濟南抹面砂漿施工前要采取一定的有效措施加熱基礎表層,使其溫度維持在KTC以上,并清理存水。
Before the construction of Jinan plastering mortar, certain effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環境施工施工位置溫度超過37°C,應按高溫氣候延緩施工并滿足以下規定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:


1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎和設備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過35°C。
3. The injection temperature of the slurry should not exceed 35 ° C.
4.施工后應及時采取補濕保養措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
免保養條件如下所示:
The maintenance free conditions are as follows:
施工溫度超過5°小于37°時,基礎施工后無需保養。超過溫度范圍應遵循抹面砂漿施工保養方法實行保養。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養需要準備的材料:薄膜,薄膜主要是為了補濕,預防水分的太早外流造成產品施工內部無法牢固,此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內部反應需要大量水分。您有需求就來我們網站http://m.zzmdwxsh.com咨詢吧!
Materials that need to be prepared for summer maintenance: thin films. Thin films are mainly used to replenish moisture and prevent the early outflow of water from causing the internal construction of the product to become unstable. In addition, it is necessary to sprinkle water on time, as it is also used to replenish moisture, as a large amount of water is required for internal reactions after construction. Come to our website if you have any needs http://m.zzmdwxsh.com Consult!
主站蜘蛛池模板:
国产永久免费高清在线观看|
菠萝蜜免费观看视频|
99爱视频精品免视看|
国产乱来乱子视频|
亚洲精品成人网线在线播放va|
国产在线精品网址你懂的|
国产精品99久久久久久宅男|
思思久久96热在精品不卡|
日韩专区欧美|
四虎永久在线精品视频观看|
四虎永久在线视频|
午夜精品区|
欧美无遮挡国产欧美另类|
国产偷国产偷亚洲清高|
4399理论片午午伦夜理片|
伊人久久大香线蕉av不卡|
亚洲欧美日韩中文二区|
在线无码免费看黄网站|
69精品无人区国产一区|
天堂Av无码Av一区二区三区|
国产精品18久久久久久vr|
国产国拍亚洲精品永久软件|
成人免费亚洲av在线|
亚洲av一般男女在线|
日本精品视频一区二区|
高跟丝袜一区二区三区|
网友自拍视频精品区|
久久婷婷大香萑太香蕉av人|
91精品啪在线观看国产18|
国产美女被遭高潮免费网站|
亚洲精品尤物av在线网站|
国产热女视频一区二区三区|
国产久9视频这里只有精品|
无码人妻精品一区二区|
国产人与zoxxxx另类|
国产成人久久综合一区|
高潮呻吟国产在线播放|
台湾无码av一区二区三区|
777米奇色狠狠俺去啊|
四虎永久在线精品影院|
精品免费av一区二区三区|

魯公網安備