公司新聞
聯(lián)系我們
濟南福華建材廠
聯(lián)系人:吳老師
電話:
手機:13864111871
0531-81901300
地址:山東省濟南市高新開發(fā)區(qū)巨野河辦事處山圈村西
抹面砂漿施工后需要養(yǎng)護嗎?
來源:http://m.zzmdwxsh.com 日期:2023-04-04 發(fā)布人:
抹面砂漿在施工后需要馬上保養(yǎng),保養(yǎng)需要留意施工時的溫度,在依據(jù)溫度的狀況確認保養(yǎng)時需要準備的材料,此外也是有無需保養(yǎng)的產(chǎn)品,具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規(guī)定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.濟南抹面砂漿施工前要采取一定的有效措施加熱基礎(chǔ)表層,使其溫度維持在KTC以上,并清理存水。
Before the construction of Jinan plastering mortar, certain effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應(yīng)按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:


1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎(chǔ)和設(shè)備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過35°C。
3. The injection temperature of the slurry should not exceed 35 ° C.
4.施工后應(yīng)及時采取補濕保養(yǎng)措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
免保養(yǎng)條件如下所示:
The maintenance free conditions are as follows:
施工溫度超過5°小于37°時,基礎(chǔ)施工后無需保養(yǎng)。超過溫度范圍應(yīng)遵循抹面砂漿施工保養(yǎng)方法實行保養(yǎng)。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養(yǎng)需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養(yǎng)需要準備的材料:薄膜,薄膜主要是為了補濕,預(yù)防水分的太早外流造成產(chǎn)品施工內(nèi)部無法牢固,此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內(nèi)部反應(yīng)需要大量水分。您有需求就來我們網(wǎng)站http://m.zzmdwxsh.com咨詢吧!
Materials that need to be prepared for summer maintenance: thin films. Thin films are mainly used to replenish moisture and prevent the early outflow of water from causing the internal construction of the product to become unstable. In addition, it is necessary to sprinkle water on time, as it is also used to replenish moisture, as a large amount of water is required for internal reactions after construction. Come to our website if you have any needs http://m.zzmdwxsh.com Consult!
主站蜘蛛池模板:
久章草在线无码视频观看
|
亚洲国产成人丁香五月激情|
日韩精品 在线一区二区|
久久电影网|
成人福利在线看|
亚洲综合网美国十次|
西西4444www大胆无码|
亚洲熟妇AV一区二区三区宅男|
男人天堂2017手机版在线|
国产成人无码免费视频97|
呦男呦女视频精品八区|
插插插精品亚洲一区|
国产淫语对白在线视频|
日本伊人色综合网站|
欧美高清精品一区二区|
亚洲福利视频网址|
被夫の上司持久侵犯耻辱|
亚洲色偷拍一区二区三区|
国产亚洲av嫩草久久|
国产超碰AV人人做人人爽|
亚洲中文久久久精品无码|
国产寡妇树林野战在线播放|
国产精品中文字幕免费|
亚洲国产五月综合网|
色先锋影音岛国av资源|
亚洲欧美日韩综合二区三区|
插入中文字幕在线一区二区三区|
色吧.com|
亚洲另类欧美综合久久图片区|
狠狠色噜噜狠狠狠狠奇米777
|
99RE6在线观看国产精品|
久久青青草原亚洲av无码|
人妻丰满熟妇a无码区|
神马影院伦理我不卡|
国产精品免费一区二区三区四区
|
亚洲AV鲁丝一区二区三区|
无码人妻精品一区二区三区下载|
亚洲成A人片在线观看中文无码
|
两个人的视频在线观看www|
乱人伦无码中文视频在线|
永久久久免费人妻精品|

魯公網(wǎng)安備