<legend id="bju6j"><track id="bju6j"></track></legend>
  1. <meter id="bju6j"><p id="bju6j"></p></meter>
    <sup id="bju6j"><rt id="bju6j"></rt></sup>

  2. 我把寡妇日出水了,久久精品国产中国久久,国产色婷婷五月精品综合在线,国产一区在线观看视频,无码内射成人免费喷射,国产午夜在线观看视频播放,国产午夜A理论毛片,国产人人干
    歡迎您瀏覽濟南巨野河福華建材廠,主營:濟南膩子粉,濟南石膏粉,濟南抹面砂漿等建筑裝飾材料,大量批發,歡迎咨詢。

    專注綠色建筑裝飾材料

    經營管理理念:讓客戶用的放心!

    24小時服務熱線:

    13864111871

    當前位置: 首頁 - 新聞動態 > 行業資訊
    行業資訊
    聯系我們

    濟南福華建材廠

    聯系人:吳老師 

    電話: 

    手機:13864111871
              0531-81901300
    地址:山東省濟南市高新開發區巨野河辦事處山圈村西


    濟南抹面砂漿:外墻水泥砂漿的抹灰如何不空鼓開裂?

    來源:http://m.zzmdwxsh.com 日期:2025-09-18 發布人:

      抹灰空鼓、裂縫在工程中一直是一個大家比較關注但一直沒有徹底解決的老大難問題,今天就從施工工序上分享一些個措施,以供參考!base64_image

      Plastering hollowing and cracks have always been a long-standing and difficult problem that people are concerned about but have not completely solved in engineering. Today, I will share some measures from the construction process for reference!

      墻體基層處理:抹灰前的基層處理時抹灰質量的關鍵之一。所以要求必須將基層表面的砂漿殘渣污垢、隔離劑、油漬等清理干凈。針對不同基層配置不同砂漿,兩種材料交接處,鋪釘鋼絲網,再抹底灰。

      Wall base treatment: One of the key factors affecting the quality of plastering during the base treatment before plastering. So it is required to clean up the mortar residue, dirt, isolation agent, oil stains, etc. on the surface of the base layer. For different base configurations, different mortars are used. At the junction of the two materials, steel wire mesh is laid and nailed, followed by the application of bottom plaster.

      基層表面垂直度和平整偏差過大,應在抹灰前剔平,當局部抹灰厚度太大時,要求用1:3水泥砂漿分層抹平,每層厚度應在7—10毫米為宜。并應該待前一層砂漿凝固后(7—8成干,發白不宜)再涂抹后一層,以防止已抹的砂漿內部產生松動。幾層濕砂漿合在一起很容易造成收縮率過大,產生裂縫、空鼓。

      The verticality and flatness deviation of the base surface are too large, and should be leveled before plastering. When the local plastering thickness is too large, it is required to use a 1:3 cement mortar layer by layer to smooth it, and the thickness of each layer should be between 7-10 millimeters. And the next layer should be applied after the previous layer of mortar has solidified (7-8% dry, not suitable for whitening) to prevent loosening inside the already applied mortar. Several layers of wet mortar combined can easily cause excessive shrinkage, resulting in cracks and hollowing.

      要求表面較光滑的混凝土墻面應剔毛。抹灰前先涂刷一道水泥漿粘結層,以增強基層的砂漿粘結能力,又可將浮灰事先粘牢于墻面上,消除砂漿與基層粉塊狀隔離因素,避免裂縫,空鼓。

      Concrete walls with smooth surfaces should be roughened. Before plastering, apply a layer of cement paste bonding layer to enhance the bonding ability of the base mortar. The floating ash can also be firmly adhered to the wall in advance to eliminate the isolation factor between the mortar and the base powder block, and avoid cracks and hollowing.

      控制工藝流程:外墻抹灰應按以下工藝流程嚴格進行:澆水濕潤基層找規矩、貼灰餅,沖筋抹底灰找平24h后彈分格線、嵌分格條抹面層灰起分格條,修分格縫24h后開始養護。

      Control the process flow: External wall plastering should be strictly carried out according to the following process flow: water the base layer to make it smooth, paste the plaster cake, flush the reinforcement, apply the bottom plaster and level it for 24 hours, then snap the dividing line, embed the dividing strip, apply the surface plaster and start the dividing strip, repair the dividing joint for 24 hours, and then start curing.

      要求抹灰前墻面應澆水濕潤。磚墻面一般澆水兩遍,滲水深度大約8—10毫米。如果各層抹灰相隔時間長,抹灰的砂漿已干,也應該在底層澆水潤濕后抹上一層灰。澆水程度要與施工季節、氣候和室內、室外操作環境有直接關系。外墻抹灰,炎夏季節應盡量避免在日光曝曬下進行抹灰。

      The wall should be moistened with water before plastering. Brick walls are usually watered twice, with a water infiltration depth of about 8-10 millimeters. If the interval between each layer of plastering is long and the plastering mortar has dried, a layer of plaster should also be applied after wetting the bottom layer with water. The degree of watering should be directly related to the construction season, climate, and indoor and outdoor operating environments. Exterior wall plastering should be avoided as much as possible during the hot summer season when exposed to sunlight.

      分層涂抹:分遍完成,分層抹灰,5~8㎜厚,采取大工序抹灰作法,濕潤墻體,刷素漿,隨刷隨抹灰。即從建筑物檐口至勒腳先抹底灰和中層砂漿,隔日再從上至下罩面灰,這期間應加強底灰澆水養護,保持濕潤狀態,對防止空裂效果很好。

      Layered application: Completed in layers, layered plastering with a thickness of 5-8 mm, using a large-scale plastering method, moistening the wall, brushing with plain slurry, and plastering as needed. From the eaves to the feet of the building, apply the bottom plaster and middle mortar first, and then cover the surface plaster from top to bottom the next day. During this period, strengthen the watering and maintenance of the bottom plaster to maintain a moist state, which is very effective in preventing air cracking.

      本文由  濟南抹面砂漿 友情奉獻.更多有關的知識請點擊  http://m.zzmdwxsh.com/   真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

      This article is a friendly contribution from Jinan plaster mortar For more related knowledge, please click http://m.zzmdwxsh.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

    ??? 主站蜘蛛池模板: 久久99热全是成人精品| 免费无码AV片在线观看中文| 亚洲视频高清不卡在线观看| 高清无码不卡视频| 亚洲首页精品国产首页| 视频一区中文字幕亚洲| 中文字幕有码日韩精品| 亚洲男人天堂2021| 国产精品美女久久久久| 国产香蕉尹人综合在线观| 精品久久亚洲一级α| 中文无码熟妇人妻av在线| 丁香亚洲综合五月天婷婷| 亚洲精品麻豆一二三区| 蜜臀一区二区av天堂| 国产午睡沙发被弄醒完整版| 无码专区aaaaaa免费视频| 国产一区二区免费不卡在线播放| 国产综合第一夜| 全部免费毛片免费播放| 成人免费视频在线观看播放| 神马影院伦理我不卡| 大胆人gogo888体艺术摄影| 亚洲成色综合网站在线| 亚洲精品无码av专区最新| 日韩中文精品亚洲第三区| 一区二区三区久久含羞草| 国产欧美另类久久久精品丝瓜| 色综合av综合无码综合网站| 久久久精品久久日韩一区综合| 久久大香香蕉国产免费网站| 狠狠久久综合伊人不卡| 亚洲熟妇久久精品| 国产精品国产av片国产| 色天天综合久久久久综合片| av网站入口在线免费观看| 成全高清在线播放电视剧| 国产尤物视频网址导航| 日韩精品中文字幕无码专区| 亚洲日韩国产精品综合在线观看| 成人av在线一区二区三区|