<legend id="bju6j"><track id="bju6j"></track></legend>
  1. <meter id="bju6j"><p id="bju6j"></p></meter>
    <sup id="bju6j"><rt id="bju6j"></rt></sup>

  2. 我把寡妇日出水了,久久精品国产中国久久,国产色婷婷五月精品综合在线,国产一区在线观看视频,无码内射成人免费喷射,国产午夜在线观看视频播放,国产午夜A理论毛片,国产人人干
    歡迎您瀏覽濟南巨野河福華建材廠,主營:濟南膩子粉,濟南石膏粉,濟南抹面砂漿等建筑裝飾材料,大量批發,歡迎咨詢。

    專注綠色建筑裝飾材料

    經營管理理念:讓客戶用的放心!

    24小時服務熱線:

    13864111871

    當前位置: 首頁 - 新聞動態 > 行業資訊
    行業資訊
    聯系我們

    濟南福華建材廠

    聯系人:吳老師 

    電話: 

    手機:13864111871
              0531-81901300
    地址:山東省濟南市高新開發區巨野河辦事處山圈村西


    三步搞定輕質抹灰石膏的施工!

    來源:http://m.zzmdwxsh.com 日期:2023-05-17 發布人:

    俗話說三分料七分工,再好的材料,如果沒有標準的施工流程,材料就發揮不出原有的產品特性,還會引起掉粉,開裂等問題。那么,在使用濟南輕質抹灰石膏施工時,都有哪些步驟,又需要注意些什么呢?
    As the saying goes, three parts are divided into seven parts, and no matter how good the material is, without a standard construction process, the material cannot fully utilize its original product characteristics, and it can also cause problems such as powder loss and cracking. So, what are the steps and what should be noted when using Jinan lightweight plastering gypsum for construction?
    01
    01
    施工流程:基層清理修補→局部加網增強處理→放線做灰餅沖筋→界面處理→抹灰石膏找平→養護是一步都少不了的。
    Construction process: grassroots cleaning and repair → local mesh reinforcement treatment → setting out and making mortar cake reinforcement → interface treatment → plastering gypsum leveling → maintenance is an indispensable step.
    02
    02
    基層處理
    Grassroots treatment
    墻面必須干凈、無粉塵、無油漬、無滲水及其它污垢物,且墻面必須平整結實、無空鼓,空洞凹陷處用本品填補找平;新墻需待水泥砂漿抹灰層充分硬化后(抹灰約7天),方可進行本品施工;施工前,建議使用界面劑對基層進行加固處理,光滑基層或頂棚,建議先造毛處理。
    The wall surface must be clean, free from dust, oil stains, water seepage, and other dirt, and the wall surface must be flat, solid, and free from hollows. Hollow and concave areas should be filled and leveled with this product; The new wall can only be constructed after the cement mortar plastering layer has fully hardened (plastering for about 7 days); Before construction, it is recommended to use an interface agent to reinforce the base layer, smooth the base layer or ceiling, and roughen it first.
    漿料配置
    Slurry configuration
    拌制前先用小泥刀將拌料用桶壁清理干凈,然后將清水倒入攪拌桶中,在攪拌的同時徐徐加入石膏粉料,用電動攪拌器攪拌至均勻無結塊,靜置約2分鐘,再攪拌30秒即可使用。每次拌料量應按找平面積所需要的量,不宜過多,要做到勤拌勤用;拌成的料漿要在初凝前用完,已經初凝的料漿不得再次加水攪拌使用。
    Before mixing, use a small trowel to clean the mixing material from the barrel wall, and then pour clean water into the mixing barrel. Slowly add gypsum powder while stirring, and use an electric mixer to stir until it is even and free of lumps. Let it stand for about 2 minutes, and then stir for another 30 seconds before use. The amount of material to be mixed each time should be based on the required amount of leveling area, and should not be too much. It is necessary to mix and use frequently; The mixed slurry should be used up before the initial setting, and the slurry that has already set should not be mixed with water again.
    批刮找平
    Batch scraping and leveling
    用灰板將配制好的漿料批刮至墻面,然后用鋁合金刮尺刮平,每次施工厚度不大于15mm,總厚度大于15mm,應該分批找平;首道批刮時,可先在基層上進行薄批,然后連續上料,這樣有利于空氣排出,提高與基層的粘結力;若批刮后表面局部出現泛白脫粉現象,可用毛刷蘸水,對泛白表面進行補水處理,水量以不滴落及不破壞砂漿層為宜,待完全干燥后進行下道工序施工。
    Scrape the prepared slurry batch onto the wall using a gray board, and then use an aluminum alloy scraper to level it. The thickness of each construction should not exceed 15mm, and the total thickness should be leveled in batches if it exceeds 15mm; When the first batch is scraped, a thin batch can be applied to the base layer first, and then the material can be continuously loaded, which is beneficial for air discharge and improves the adhesion with the base layer; If there is local whitening and powder peeling on the surface after batch scraping, a brush can be dipped in water to replenish the whitening surface. The water amount should not drip or damage the mortar layer, and the next process of construction should be carried out after it is completely dry.
    濟南輕質抹灰石膏
    03
    03
    1、本品按照參考比例加清水即可使用,禁止與其他石膏粉混合使用!
    1. This product can be used by adding water according to the reference ratio. It is prohibited to mix with other gypsum powder!
    2、施工溫度建議在5-35℃,空氣相對濕度<85%條件下施工,溫度和濕度的變化對可用時間及干燥速度都有影響。遇夏天高溫天氣,磚墻、混凝土墻、頂棚找平前,噴灑1-2遍水進行潤濕,表面無水珠流淌即可進行施工。遇大風天氣施工,建議關閉門窗,避免因空氣流通過快導致表面迅速失水影響強度。
    2. The construction temperature is recommended to be between 5 and 35 ℃, and the relative humidity of the air is less than 85%. The changes in temperature and humidity have an impact on the available time and drying speed. In hot summer weather, before leveling brick walls, concrete walls, and ceilings, spray 1-2 times of water to moisten them. Construction can proceed without any water droplets flowing on the surface. When constructing in windy weather, it is recommended to close doors and windows to avoid rapid surface water loss and strength impact due to rapid air flow.
    3、攪拌請使用干凈的桶和工具,切忌將已干結的漿體拌水后再用。
    3. Please use a clean bucket and tools for mixing, and do not mix the dried slurry with water before reuse.
    以上就是所講解的三步搞定輕質抹灰石膏的施工事項了,希望能夠幫助到您,更多事項就來我們網站http://m.zzmdwxsh.com咨詢!
    The above are the three steps explained to complete the construction of lightweight plastering gypsum. We hope it can help you. For more information, please visit our website http://m.zzmdwxsh.com consulting service

    ??? 主站蜘蛛池模板: 成a人v欧美综合天堂| 亚洲精品二区三区在线观看| 暖暖 在线 视频 免费 视频| 欧美一级色视频| 硬汉视频在线观看免费完整版| 国产尤物av尤物在线观看| 欧美亚洲另类 丝袜综合网| 精品午夜国产福利在线观看 | 国产成人精品亚洲一区二区| 亚洲国产精品va在线播放| av网址不卡免费在线观看| 精品国产精品三级精品av网址| 狠狠爱五月丁香亚洲综合| 码亚洲中文无码AV在线| 中文字幕av日韩有码| 高清国产美女一级a毛片在线| AV无码精品一区二区三区宅噜噜| 国产精品亚洲一区二区毛片| 日本熟妇人妻一区二区三区| 国产精品不卡片视频免费观看| 精品国产AV最大网站| 中文字幕av熟女人妻| 2021国内精品久久久久精免费| 亚洲夂夂婷婷色拍ww47| 日本中文字幕乱码免费| 国产伦一区二区三区久久| 国产高清在线精品一区免费| av在线手机播放| 国产成人精品亚洲一区二区| 免费高清自慰一区二区三区| 在线看片免费人成视频大全| 欧美疯狂三p群体交乱视频| 粗暴进入娇小呻吟痛呼| 色 亚洲 日韩 国产 综合| 激情综合色综合啪啪五月丁香 | 成全视频在线观看更新时间| 亚洲一区二区三区av在线免费| 熟女av一区二区三区| 天堂一区二区三区av| 国产精品高潮无码毛片| 亚洲中文字幕精品第三区|