5. In the environment of over-heated and dry wall or intense wind and light, wet the wall with clear water as far as possible, and stop the application of putty layer after the wall has no clear water.
6.呈現(xiàn)大面積起泡的膩?zhàn)用妫苗P刀直接壓破小泡口,重新用適宜的膩?zhàn)邮┕纹鹋莸拿鎸印?/div>
6. Presentation of a large area of foaming putty surface, with a spade to directly break the small bubble mouth, re-use the appropriate putty to scrape the foaming surface.
7..膩?zhàn)臃燮胀ㄔ跀嚢杵骄螅o置 10 分鐘左右,讓各種成分充沛潤濕溶解,然后用電動攪拌機(jī)再次攪拌后上墻。
7. Putty powder is usually stirred after an average of about 10 minutes, so that various ingredients are abundantly wetted and dissolved, and then stirred again with an electric mixer on the wall.
8.膩?zhàn)邮┕r應(yīng)在墻面重復(fù)批刮、推碾,讓膩?zhàn)优c基層充沛接觸、潮濕、浸透、擴(kuò)散施工第二道或者后一道面層呈現(xiàn)膩?zhàn)訉悠鹋莠F(xiàn)象,應(yīng)在水印消弭前用刮刀停止壓泡廢除處置,保證膩?zhàn)用嫔喜怀尸F(xiàn)氣泡。
8. Putty construction should be repeated batch scraping and rolling on the wall surface to make the second or last surface of the putty fully contact with the base, moist, soaking and diffusing construction present the phenomenon of putty layer bubbling. Putty surface should be removed by scraper before watermarking elimination, so as to ensure that no bubbles appear on the putty surface.
9.墻體預(yù)前處置:如預(yù)制模版墻頂汽泡特別嚴(yán)重的,可先停止?jié)袼幹米屵M(jìn)吸水并排出空氣。待枯燥后停止界面封底處置,然后停止粗石膏底找平處置,后批刮膩?zhàn)樱莠F(xiàn)象會相對好很多。
9. Wall pre-disposal: If the top bubble of prefabricated template wall is particularly serious, wet water disposal can be stopped first to let in water absorption and exhaust air. After drying, stop the treatment of interface bottom sealing, then stop the treatment of rough gypsum bottom leveling, and finally scrape putty, the bubble phenomenon will be much better.
10.膩?zhàn)优我欢ú灰^厚,膩?zhàn)拥墓τ枚ㄎ唬壕珳?zhǔn)裝飾找平資料。膩?zhàn)痈嗟氖瞧鸬脚c外表乳膠漆銜接,同時可做為外表裝飾層,批刮過厚容易起泡同時也會形成后期墻體空鼓的機(jī)率。
10. Putty scraping must not be too thick. Putty function positioning: precise decoration leveling data. Putty is mostly used to connect with the exterior latex paint, and can also be used as a decorative layer. It is easy to foam when scraping too thick, and it will also form the possibility of empty wall in the later period.
11.施工時留意天氣,空氣濕度達(dá)75%以上,墻面含水率達(dá)10%以上,防止施工。
11. Attention should be paid to the weather during construction. The air humidity is over 75% and the water content of the wall is over 10%, so as to prevent construction.